Gurhan Construction Logistics balad air base Iraq
LOGISTICS SUPPORT SERVICE BALAD AIR BASE
18 May 2018
UPGRADE of the NAVAIDS
20 May 2018

GUARD TOWER PRIME POWER UPGRADE

Work Given SALLYPORT GLOBAL SERVICES

 A Michael Baker International Company

Name of Project: Guard Tower Prime Power Upgrade at Balad AB, IRAQ.
Description of Work: Project included repair and upgrades in each of existing 51 perimeter towers numbered 1 thru 51. All interior outlets, switches, wire etc. had been removed and disposed. All the components for electrical system had been replaced. New 11 pcs. Subcompact 11 kVA transformer, 11 pcs Automatic Transfer Switch and 51 pcs direct burial underground SWA cable had been installed. The end result of this contract had been allow all guard towers to operate efficiently and safely with 3 phases of electric to be used one each for ESS power, AC power and remaining for lighting and receptacles.
gurhan-sally-port-3.png
gurrhan-sally-port-2
gurrhan-sally-port-4